Road trafficTraffic jams for eleven kilometers in front of the Gotthard north portal
SDA
3.8.2024 - 09:25
On Saturday, traffic on the A2 exceeded the capacity of the Gotthard road tunnel. Heading south, the traffic jam in front of the north portal in the canton of Uri reached a length of eleven kilometers at 9:00 am.
Keystone-SDA
03.08.2024, 09:25
SDA
As the Touring Club of Switzerland (TCS) reported on X, this meant that motorists had to wait around one hour and 50 minutes before they could enter the tunnel in Göschenen UR.
According to the TCS website, traffic was backed up for around four kilometers in the northbound direction. This meant a waiting time of up to 40 minutes in front of the south portal.
Traffic jams in front of the Gotthard road tunnel are part of everyday life during the summer vacation period. The reason for this is that there is only one lane per direction of travel in the 17-kilometre-long tube and the volume of traffic is often high.